Product Detail :
|
Modernization and System Augmentation Works (Supply and Erection) • Construction of New 33/11kv Substations (AIS and GIS), Capacity Enhancement (Augmentation) and installation of New 33/11 KV Power Substation, Construction of 33 kv and 11 kv overhead and underground New Lines, Installation of Mid line smart sectionalizer and FPI, Installation of new Distribution Transformer on plinth/ H-Beam Four Pole / Double pole structure, Installation of Compact Sub Station and Augmentation of existing distribution Transformer, Insulation of 33 kv, 11kv and LT Steel Tubular Poles in dense/ Market Areas, Replacement of 11 kv power cable and 1.1 kv control cable in existing 33/11kv sub-stations, Replacement of 33kv and 11kv bare conductor by covered conductor in densely populated area, Conversion of existing LT bare conductor line into LT underground network with LT double supply arrangement in dense/Market Area, Providing MS Strip Fencing at Existing distribution transformers, Replacement of old switch gear / isolator /LA/CT/PT/ Battery Battery Chargers, Installation of LT ACB on 250 KVA and 400 KVA Distribution Transformers, Construction of new 33 KV GIS and AIS Bay at Primary Sub- Stations.
|