Product Detail :
|
TANGEDCO NCTPS II Mechanical II Circle AHP Dn Operation and Maintenance of PDFAC System Mechanical Electrical for the first two rows of the ESP hoppers i e 32 Nos of hoppers per unit total 64 Nos of hoppers and its auxiliary equipments which consists of PLC System control room MD Pumps D Pumps and auxiliaries ash conveying pipe lines bends Air compressors its auxiliaries Air Receiver Tank intermediate silos cooling water system RO systems AC ventilation system trenches HT LT transformers modules switch gears breakers bus ducts UPS battery bank Lighting systems panels cables Level measuring instruments E I equipments and Hoists etc including T Ps and consumables in Units I II of NCTPS II for the period of 3 years from the date of handing over of site with fixed escalation of 5% per annum on the first year rate from second year onwards.
|